HTCB – VCB
(TOSHIBA MAKE) LTCB
– ACB (TOSHIBA MAKE)
1.
Obtain
work permit from operations for the required transformer with proper tag
number.
2.
Check
all the parameters on both HV/LV side and both LV & HV are closed. Check
both transformers are in service.
3.
Prepare
caution notice/permit to work and display it on HV & LV panels.
4.
Switch
off LV side breaker (ACB), and then switch
off HV side breaker (ACB) of current tag number. Make sure that there is no
power interruption.
5.
Open
the HT breaker panel. Lift the latch pin upward on both the handles pull the
breaker outward from service position to test position.
6.
Switch
off control supply and remove control plugs and the front o ‘CB’. Remove the
stopper plate, pull the VCB outside
breaker compartment
7.
Open
LV (ACB) breaker panel.
8.
Lift
the flapper (Middle of breaker – right hand side) upward and insert rack out/in
handle into the slot.
9.
Rotate
the handle anti-clockwise till it reaches disconnected position. Pull the ACB
outward after lifting the stopper levers on both sides of ACB
10. Position the trolley carrier and move
it inside, below the lifting pins or both sides of ACB. Lift the trolley upward
will it carries breaker. Pull the trolley outside and place the breaker on
floor.
11. Release charged spring by manually
operating on/off of VCB and ACB.
12. Put the earthing hand le of 3.3 KV
side earthing switch compartment which is above VCB cubicle.
13. Slide the stopper plate towards right
hand side, lift earthing leaver and release the stopper plate.
14. Remove the castle key from ACB,
insert in the earthing breaker operate the key to release the locking pin.
15. Insert the rack-in handle to the slot
(right side) and turn it clockwise if it reaches service position.
16. Remove handle and switch on control
supply of earthing switch.
17. Close panel door and turn earthing
switch on. Observe earthing indication.\provide barrier caution tape on both
sides of transformer of correct tag number.
18. Clean whole transformer. Open LV
& HV side terminal boxes. Inspect and tighten terminations hi-speed
bushings.
19. Clean and tighten all earthing
connections.
20. Measure insulation resistance of
primary and secondary windings with earth and between windings. For HT winding
use 2.5KV megger. For LV winding use 500V megger. Remove LT side neutral link
before meggering.
21. Close the terminal boxes. Check inert
gas pressure. Take transformer oil for testing.
22. Clean, check and inspect VCB and ACB
for looseness and any abnormality. Apply petroleum jelly for finger contacts.
Megger insulation resistance values of terminals. Measure contact resistance of
poles.
23. Check manual operations of ACB and
VCB.
24. Insert VCB in breaker compartment up
to test position. Put back the stopper flap in position. Make sure breaker is
off plug in control pin plugs and switch on control supply.
25. Rack out earthing breaker to
disconnected position on LV side. Take out the castle key.
26. Insert the ACB using trolley and rack
– in by turning rack – in handle clockwise to service position.
27. Perform functional test by operating
protective devices.
28. Push both breakers to service
position. Switch on HT breaker. Observe voltage.
29. Close LT breaker. Observe voltage and
current on both HT & LT sides.
30. Remove caution tags and cancel
permit.
31. Enter rack – in / rack – out details
in substation log book.
32. Record all readings and values in
history cards.
33. Send oil samples for testing acidity
and dielectric strength.